Glossary entry

English term or phrase:

future-period bucket planning feature

Arabic translation:

ميزة التخطيط لمشاريع كثيرة في المستقبل

Added to glossary by Ahmed Samir
Apr 18, 2010 09:10
14 yrs ago
2 viewers *
English term

future-period bucket planning feature

English to Arabic Other Construction / Civil Engineering
context:
With its interactive, flexible PERT and Gantt charts, Primavera Contractor makes it simple for general contractors to communicate with clients as well as designers, other contractors, and subcontractors—in short, all members of a project team. What’s more, Primavera Contractor’s future-period bucket planning feature lets planners and schedulers model resource requirements in a way that truly reflects how work is planned and performed. This functionality enables custom distributions, or spreads, to be entered per resource

Proposed translations

1 hr
Selected

ميزة التخطيط لمشاريع كثيرة في المستقبل

ميزة التخطيط لعدد كبير من المشاريع في المستقبل
ميزة وضع عدد كبير من الخطط المستقبلية
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "thanks"
1 hr

Which term is needed to be arabized?!!!!!!

Full translation for free:

تتضمن الفترة المستقبلية خاصية التخطيط
Something went wrong...
1 hr

خاصية التخطيط بتوزيع الموارد للفترة المستقبلية حسب الطلب

Plan and Schedule Projects Quickly and Easily Add activities quickly and easily, drag and drop activity bars to add constraints or modify your plan, and still take full advantage of CriticalPath Scheduling. Interactive, flexible PERT and Gantt charts make it simple for general contractors to communicate with the client as wellas other designers and contractors. Future Period Bucket Planning enables Planner/Scheduler to enter a custom distribution, or spread, per resource or role assignment, to model resource requirements in a way that truly reflects how the work is planned and performed. With Primavera Contractor, planningthe work and managing changes is quick and easy.
http://www.cbainc.com/UserFiles/File/3_Software/Contractor/C...
Something went wrong...
1 day 4 hrs

خاصية التخطيط للاستفادة المستقبلية

What’s more, Primavera Contractor’s future-period bucket planning feature lets
وعلاوة على ذلك، إنَّ خاصية التخطيط للاستفادة المستقبلية من مجموعة المتعاقدين في بريمافيرا تسمح...