Glossary entry (derived from question below)
English term or phrase:
Interconnecting Board PC2
Polish translation:
płyta połączeniowa PC2
Added to glossary by
Polangmar
Apr 24, 2011 17:45
13 yrs ago
4 viewers *
English term
Interconnecting Board PC2
English to Polish
Tech/Engineering
Metallurgy / Casting
spawalnictwo/welding
instrukcja obsługi spawarki, część i ściąganiu obudowy i pomiarze napięcia na kondensatorze
1 Outside Handle Screws
To loosen top, remove two outside
handle screws from both handles
and all side bolts.
2 Interconnecting Board PC2
3 Voltmeter
Measure the DC voltage across the
screw terminals on RC3 and RC5
as shown until voltage drops to near
0 (zero) volts.
Proceed with job inside unit. Reinstall
cover when finished.
1 Outside Handle Screws
To loosen top, remove two outside
handle screws from both handles
and all side bolts.
2 Interconnecting Board PC2
3 Voltmeter
Measure the DC voltage across the
screw terminals on RC3 and RC5
as shown until voltage drops to near
0 (zero) volts.
Proceed with job inside unit. Reinstall
cover when finished.
Proposed translations
(Polish)
4 | płyta połączeniowa PC2 | Polangmar |
Change log
Apr 24, 2011 17:45: changed "Kudoz queue" from "In queue" to "Public"
Apr 27, 2011 16:59: Polangmar Created KOG entry
Proposed translations
6 hrs
Selected
płyta połączeniowa PC2
PC2 to oznaczenie, którego nie trzeba tłumaczyć.
http://tinyurl.com/3pjzbn7
Check inverter control board PC1 for proper seating
Check weld control board PC3 for proper seating
Check boost control board PC10 for proper seating
Check continuity of Power switch S1, and replace if necessary.
Check bus voltage on power interconnect board PC2 receptacle RC5 replace PC2 if necessary.
http://www.mig-welding.co.uk/forum/showthread.php?t=10795
http://tinyurl.com/3pjzbn7
Check inverter control board PC1 for proper seating
Check weld control board PC3 for proper seating
Check boost control board PC10 for proper seating
Check continuity of Power switch S1, and replace if necessary.
Check bus voltage on power interconnect board PC2 receptacle RC5 replace PC2 if necessary.
http://www.mig-welding.co.uk/forum/showthread.php?t=10795
Note from asker:
dziękuję;) zerkniesz jeszcze na dwa poprzednie pytania (trigger hold i low sensing voltage)? |
4 KudoZ points awarded for this answer.
Discussion