Polish to English translations [PRO] Tech/Engineering - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Frank Szmulowicz, Ph. D. United States Local time: 05:21 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | start-up commencement |
| ||
4 | Beginning of start-up |
| ||
3 +1 | start of the commissioning process |
|
start-up commencement Explanation: IMVHO :) |
| |
Login to enter a peer comment (or grade) |
Beginning of start-up Explanation: Na przykład. |
| |
Login to enter a peer comment (or grade) |
start of the commissioning process Explanation: Propozycja. -------------------------------------------------- Note added at 4 hrs (2018-05-25 21:35:04 GMT) -------------------------------------------------- Commissioning for a newly built process unit is a necessary activity that takes weeks to accomplish and costs 3-4% of the capital cost of the whole project. Commissioning includes a list of activities that is too long to list here, but here are some examples: calibrating every instrument and control valve on the unit, checking the proper action of all controllers, bumping all electric motors to ensure that they turn in the right direction, verifying all pump alignments, tracing every pipe in the unit to make sure that it conforms to the P&ID and has the necessary high point bleeds and low point drains, loading the initial charge of all reactor catalysts, using air or water to flush out piping to remove debris, inspection of all vessels to confirm proper installation of internals, activating all utility systems, rolling all steam turbines while disconnected from the load to assure balance, confirming the circuitry on all electrical switches on the unit and ensuring that they’re properly marked, testing the programming on all PLC’s (programmable logic controllers), installation of all safety appliances, putting together a master blind list for the unit and making sure that all blinds are procured, and the list goes on and on.... Unit start-up is a relatively short-term proposition compared to commissioning. It involves purging all air from the unit, bringing in oil inventory where it belongs, drying out green refractory, preparing catalysts for operation, and going through the step-by-step start-up procedure to bring the unit up to normal operation. https://www.quora.com/What-is-the-difference-between-plant-s... cccccccccccccc As nouns the difference between startup and commissioning is that startup is the act or process of starting a process or machine or startup can be a kind of high-low or thigh-high boot worn by rustic people while commissioning is the process of assuring that all systems and components of a major piece of equipment, a process, a building or similar are designed, installed and tested according to the operational requirements of the owner or final client. https://wikidiff.com/commissioning/startup |
| |
Login or register (free and only takes a few minutes) to participate in this question. You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy. KudoZ™ translation helpThe KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.
See also: Search millions of term translations Your current localization setting
English
Select a language Close search
|