CPM (critical path method) méthode du chemin critique Explanation: CPM (critical path method) is used for transport and construction (cf. https://www.smeinc.com/news-events/article/5-benefits-to-usi... ). One of the possible French translations is "méthode du chemin critique". IATE also mentions "méthode du trajet critique", "méthode du cheminement critique", "méthode d'analyse par réseau maillé" and "planification par diagramme à flèches". https://en.wikipedia.org/wiki/Critical_path_method https://www.planzone.fr/blog/quest-ce-que-la-methode-chemin-critique-critical-path#:~:text=Le%20chemin%20critique%20d%C3%A9signe%20l,date%20 |
| ||||||||||||||||||||||||
Grading comment
| |||||||||||||||||||||||||
|
31 mins |
Reference: define the acronyim first Reference information: The asker should do this if possible Plenty of options: CPM - What does CPM stand for? The Free DictionaryCPM Cost Per Minute CPM Central Policy Manager (various companies) CPM Consumer Product Manufacturing (various organizations) CPM Comprehensive Performance Management 177 more rows -------------------------------------------------- Note added at 32 mins (2022-07-18 18:04:08 GMT) -------------------------------------------------- Cost per minute |
| ||
Note to reference poster
| |||
Login to enter a peer comment (or grade) |
3 hrs peer agreement (net): +1 |
Reference: CPM/CPA Reference information: The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities.[1] It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time[2] required to complete them from start to finish. [chart] PERT chart for a project with five milestones (10 through 50) and six activities (A through F). The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month. https://en.m.wikipedia.org/wiki/Critical_path_method See also https://fr.m.wikipedia.org/wiki/Chemin_critique |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.